DTIC ADA154151: Preparation Costs of Step Two pdf

DTIC ADA154151: Preparation Costs of Step Two_bookcover

DTIC ADA154151: Preparation Costs of Step Two

More Book Details

Description of the Book:

This thesis compares the cost to the government of contracting out Special Project Step Two submissions versus the cost of preparing Step Two submissions with in-house government employees. Data from 80 Step Twos prepared at two Navy Public Works Centers was collected and analyzed. The results indicate conclusively that Step Two preparation by in-house employees is much less costly than contracting out Step Two preparation. In addition to the cost comparison, predictive models were developed for Step Two preparation cost, based upon certain characteristics of the Special Project for which the Step Two is being prepared. The thesis contains background information on the Naval Facilities Engineering Command, Navy Public Works Centers, the Special Project program, and the negotiated architectural and engineering contract process. Possible alternatives to the current Step Two preparation process are presented and discussed

  • Creator/s: Defense Technical Information Center
  • Date: 12/1/1984
  • Year: 1984
  • Book Topics/Themes: DTIC Archive, Dressel, K W, NAVAL POSTGRADUATE SCHOOL MONTEREY CA, *CONTRACTS, *COST ANALYSIS, PREPARATION, PREDICTIONS, MODELS, NAVAL PERSONNEL, NAVY, COMPARISON, THESES, COSTS, MATHEMATICAL PREDICTION, PERSONNEL, RESOURCE MANAGEMENT, NAVAL SHORE FACILITIES, GOVERNMENT EMPLOYEES

An excerpt captured from the PDF book

DTIC ADA154151: Preparation Costs of Step Two_book-excerpt

Report Broken Link

File Copyright Claim

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *

Categories

You might be also interested in these Books

Related Posts
PDF Viewer

الرجاء الانتظار بينما يتم تحميل الـ PDF…
HTML Popup Example