This book was retrived from archive.org

DTIC ADA195273: Installation Restoration Program. Phase 1 pdf

DTIC ADA195273: Installation Restoration Program. Phase 1_bookcover

DTIC ADA195273: Installation Restoration Program. Phase 1

More Book Details

Description of the Book:

The Hazardous Materials Technical Center (HMTC) was retained in August 1985 to conduct the Installation Restoration Program (IRP) Phase I Records Search of the 167th Tactical Airlift Group (TAG), Shepherd Field Air National Guard Base (ANGB). The Records Search included a detailed review of pertinent installation records and an onsite base visit conducted by HMTC on August 19, 1985. Activities during the onsite base visit included interviews with six base employees, a site survey, and a search of base records. Keywords: Hazardous materials

  • Creator/s: Defense Technical Information Center
  • Date: 3/1/1986
  • Year: 1986
  • Book Topics/Themes: DTIC Archive, , HAZARDOUS MATERIALS TECHNICAL CENTER ROCKVILLE MD, *FACILITIES, *HAZARDOUS MATERIALS, *RECORDS, PERSONNEL, SEARCHING, SITES, SURVEYS, WEST VIRGINIA

An excerpt captured from the PDF book

DTIC ADA195273: Installation Restoration Program. Phase 1_book-excerpt

Report Broken Link

File Copyright Claim

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *

Categories

You might be also interested in these Books

Related Posts
PDF Viewer

الرجاء الانتظار بينما يتم تحميل الـ PDF…
HTML Popup Example