DTIC ADA634058: Environmental Assessment: Construct Mass/Mobility Parking pdf

DTIC ADA634058: Environmental Assessment: Construct Mass/Mobility Parking_bookcover

DTIC ADA634058: Environmental Assessment: Construct Mass/Mobility Parking

More Book Details

Description of the Book:

This Final EA has been prepared in accordance with the National Environmental Policy Act, and assesses the potential environmental impacts of constructing a mass/mobility parking lot on Grand Forks AFB located in Grand Forks County, North Dakota. Resource areas analyzed in the EA include Air Quality;.Noise, Wastes, Hazardous Materials, and Stored Fuels; Water Resources; Biological Resources; Socioeconomic Resources; Cultural Resources; Land Use; Transportation Systems Airspace/ Airfield Operations; Safety and Occupation Health Environmental Management; and Environmental Justice. In addition to the Proposed Action, the Alternative Action and the No Action Alternative were analyzed in the EA. The EA also addresses the potential cumulative effects of the associated construction activities along with other concurrent actions at Grand Forks AFB and the surrounding area

  • Creator/s: Defense Technical Information Center
  • Date: 2/13/2004
  • Year: 2004
  • Book Topics/Themes: DTIC Archive, , 319 CIVIL ENGINEER SQUADRON GRAND FORKS AFB ND, *AIR FORCE FACILITIES, *ENVIRONMENTAL ASSESSMENT, *PARKING FACILITIES, AIR QUALITY, AIR SPACE, CONSTRUCTION, CULTURAL RESOURCES, ENVIRONMENTAL MANAGEMENT, HAZARDOUS MATERIALS, HAZARDOUS WASTES, LAND USE, NOISE, RECREATION, SAFETY, TRANSPORTATION, WATER RESOURCES

An excerpt captured from the PDF book

DTIC ADA634058: Environmental Assessment: Construct Mass/Mobility Parking_book-excerpt

Report Broken Link

File Copyright Claim

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *

Categories

You might be also interested in these Books

Related Posts
PDF Viewer

الرجاء الانتظار بينما يتم تحميل الـ PDF…
HTML Popup Example