NASA Technical Reports Server (NTRS) : NASA pdf

NASA Technical Reports Server (NTRS) : NASA_bookcover

NASA Technical Reports Server (NTRS) : NASA

More Book Details

Description of the Book:

The Aeronautics Test Program (ATP) within the National Aeronautics and Space Administration (NASA) Aeronautics Research Mission Directorate (ARMD) initiated a strategic planning effort to re-vitalize the force measurement capability within NASA. The team responsible for developing the plan included members from three NASA Centers (Langley, Ames and Glenn) as well as members from the Air Force s Arnold Engineering and Development Center (AEDC). After visiting and discussing force measurement needs and current capabilities at each participating facility as well as selected force measurement companies, a strategic plan was developed to guide future NASA investments. This paper will provide the details of the strategic plan and include asset management, organization and technology research and development investment priorities as well as efforts to date

  • Creator/s: NASA Technical Reports Server (NTRS
  • Date: 5/5/2008
  • Year: 2008
  • Book Topics/Themes: NASA Technical Reports Server (NTRS), MANAGEMENT PLANNING, NASA PROGRAMS, MANAGEMENT SYSTEMS, SPACE MISSIONS, PRODUCT DEVELOPMENT, PRIORITIES, Rhew, Ray D

An excerpt captured from the PDF book

NASA Technical Reports Server (NTRS) : NASA_book-excerpt

Report Broken Link

File Copyright Claim

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *

Categories

You might be also interested in these Books

Related Posts
PDF Viewer

الرجاء الانتظار بينما يتم تحميل الـ PDF…
HTML Popup Example